A transmission utility replaced helicopter and rope-access inspection with an automated RTK corridor flight covering 410 kilometres of high-voltage line.

power line inspection saudi — Power infrastructure — 1
power line inspection saudi — Power infrastructure — 2

Technical specifications

Line length inspected
410 km
Cost reduction
64%
Personnel exposure
Near zero
Defect detection
AI-assisted

Overview

The utility inspects 410 kilometres of 380 kV transmission line in a region where helicopters are grounded for part of the year and rope access is slow and expensive. An automated corridor flight along the line centre, captured by an RTK-fixed platform with a zoom payload, replaces the visual pass with a repeatable one. Flights are planned from the line geometry rather than flown manually, which means each inspection produces the same image set regardless of the pilot, and the imagery feeds a defect-detection model that flags corrosion, broken insulator strings and vegetation encroachment. The reported saving is 64 per cent against helicopter inspection and a corresponding drop in the number of personnel exposed to high-voltage environments to near zero.